Finished up almost all of the new power service stuff: trenched, installed the meter base, wired a GFCI outlet to the pole, laid and cemented conduit, and ran the primary service wire to the entry point. I couldn't get the ground rods in with just my axe, so I hope to hire someone to do that this week. We'll see if it passes inspection!